This is Part 2 of the Didcot: The fabrication of the
boiler.
Part
1 Part 2
Part 3
Part 4
Extra part 4a
Here are new photos and text of
the boiler progress of the Didcot. I started with the boiler on the
first of April 1999 and it was tested on the first of November 1999. The
drawing of the boiler was changed to metric and modified to suit the Dutch
boiler inspector, and a ACAD14 file is available.
I presume
these photo's will be helpful for new boiler
builders; as I found there is not much information about model boiler
building on the internet.
The
valves were
milled from cast iron and I hope this give a good service on the bronze port
face of the cylinder block. On my 3.5" 0-6-2- ‘Mona’ I used a cast iron port
face with bronze valves and this proofed to be excellent in service. The
buckles are milled from a piece of 5 mm thick brass and are on the photo
still attached to each other. Such a buckle allows the valve to set it self
to the port face under the steam pressure.
By this locomotive there is one
combined steam
chest that sits between the two cylinders. Because this is an inside
cylindered locomotive there is not much space for the steam chest (if one
wants to place to reasonable sized cylinders also in-between the frames).
The steam chest is only 20mm wide. The valves them self are 9 mm high.
This
top-view shows
how the valves will sit against the port face of the cylinder. Valve setting
was done this way, which give a good visibility. The valve rods were made to
length, so that afterwards (when the steam chest was put in position) there
was no need to set the valves again.
I would like to take the opportunity
to explain
how I made a 'double' flanged
throat plate for my belpaire boiler of my 5"
gauge 0-4-2 locomotive. Not that I think that I'm
an expert on the subject (far from it), but I found it quite easy to
make the 3mm thick copper throat plate using only
a simple jig.
Click
here for the step by step
explication
The method is very simple, but you have to work the other way around as
normal.
These are the
boiler backhead and throat plate and their formers. Clearly visible on
the left is the Tufnol disk with its locating bolt, that held the throat
plate on its position during the flanging of the outer shape.
The complete formed
boiler parts awaiting the
next stage of manufacturing. A careful study of the drawing and design was
now necessary, so the final boiler will be satisfactory. I only found later
on that I still had made two mistakes! Although I used ACAD to design the
boiler the boiler inspector found during his inspection of the parts that
the distance between four of the fire tubes would be to small for good
water circulation. He advised me to make a new firebox tube plate and
arrange the fire tubes layout in such a manner, so that there was always a
minimum of three millimetres of space between around each tube. So back to
the computer and setting out a new tube layout. With some moving around and
some puzzling this problem was solved, which took in fact more time than the
fabrication of the new plate.
The second mistake was only a small
one, but for me enough to correct. The top feed bush was located on the
drawing in the wrong position. On the boiler drawing the dimension and
location was different than on the general arrangement, and I only spotted
this problem , when I put the drilled boiler barrel on the drawing. A disk
of 3 mm copper was used to cover up the wrongly located hole and a new one
was drilled in this one. Now on the correct position....... only 7 mm more
to front of the boiler. I wonder if anyone had noticed if I didn’t change
the location, but once you’re in studying the prototype that closely, you
want to make your model as good as possible. Am I becoming a rivet counter??
I must beware!!
In this position the
outer- and inner-firebox will be located once the boiler is finished.
This is still the old firebox tube plate that was later replaced for a new
one for the reasons stated above. The water space on the sides and back of
the firebox is 8 mm (7/16”) and in front it is 10 mm (3/8”).
The inner firebox will stick out of
the boiler for about 8 mm. This flange will than be used for fixing the
ash-pan to it.
The drilling and
boring of the holes
for the fire- and superheating tubes was done on my milling machine. With
the aid of the Digital Read Out is easy to locate the holes in the correct
position, as determined with the CAD software.
The large superheater tube (25 mm)
wasn’t drilled, but made with the boring head.
A test set-up of the
tube bank. The holes are
all a little oversized and not, as stated in most of the available
construction notes in the ME press, reamed to a close fit. This would be
incorrect for soldering, as the tubes will expand during the process and
than there would be no gap for the solder the penetrate. To prevent leaks
around tubes, a rough surfaced hole and a little over dimension of the hole
are ideal, so that solder will always be able to get in the joint.
The
circular layout of
the tube bank is good visible in this picture. The one superheater tube will
be equipped with a concentric stainless steel superheater element.
The 2.5 mm thick copper
plate of the
outer
firebox shell was annealed first, and than bended by hand of a wooden
former. The former was made of several plates of 15 mm thick MDF plate
glued together. Each plate was first CNC milled in the contour of the
firebox. A former like this takes some time in preparation, but once you
have it, the copper plate is ready in minutes. Working with such a former
block makes sure that everything will get the correct dimension and shape.
This was the set-up for
drilling and boring the dome-bush hole and top feed hole in the boiler
barrel. Alas, as described earlier, the top feed bush was in the wrong
position, and had to be corrected later on.
The bronze
dome bush was
first turned in the lathe and in the milling machine the 12 holes were
drilled and taped, that later on will be used hold the inner dome. Four
small M3 bolts were used to clamp the dome bush to a steel plate, which in
its turn was clamped in the vice. In this set-up it was easy to bore out the
large radius on the underside of the bush, with which the bush will sit on
the boiler barrel.
Here the
inner and outer
boiler are standing aside. The inner boiler looks that pink, because it
was sand blasted after soldering. This gave the opportunity to check if all
the tubes and other joints of the fire box were good. The small mistakes
that occurred (not enough silver solder in one joints between crown sheet
and fire box tube plate) could now easily resoldered. Better be safe than
sorrow!
The outer boiler is now also
soldered and the location is set for the
hole for
safety valve and the hole is made. The outer boiler is clamped to the
milling table by use of a large T-bolt going through the firebox and boiler
barrel. On top a steel plate with a hole in it, was used to take up the nut.
An extra clamp is used on the throat plate to prevent the boiler shell from
shifting during the process.
On the Swindon work drawings I found
that the fire hole
was conical shaped. I wanted to copy this on the model, because I
experienced on my 3.5" tank locomotive, that you do not have a good view on
the fire, once you are in the driving position behind the locomotive. A
conical shaped fire hole would give a far more better view on the small fire
box and it would give also the opportunity to control the fire better. For
this purpose a special conical ring was turned from copper bar. On the
outside of the boiler backhead it is only 36 mm in diameter, but on the
inside it is almost 60 mm in diameter.
The
fire
hole ring is hardly visible lying on top of the fire box, but the good
view inside the firebox is very clear.
Soldering
was mostly done with two Sievert propane burners. The good summer we had in
1999 allowed me to work outside the workshop. With such a large boiler
(although very small for 5" gauge) it is almost impossible to solder inside.
The amount of heat necessary for soldering would melt the sealing in the
work shop. The small parts I did solder in the work shop raised the
temperature very quickly to 45° C.
When the parts were sufficient
cooled down after soldering they were pickled in acid. The tank I used,
normally functions as our chemical waste container, kindly provided by the
city-counsel.
After about ten minutes in the acid,
the copper comes out of the pickling
tank with a nice pink clean surface. This removes the oxides and brazing
flux residue from the copper in a fast and efficient way and also prepares
the copper for the next stage of soldering.
Without the backhead in position the
boiler was
now fitted on the locomotive frame. Clearances between the firebox and
the frame could now be checked and the height for the boiler supports could
now be determined.
The
crown stays in this boiler are
of the so called ‘rod stays’ type and not the more widely used plate stays.
They are turned from 5mm dia. copper rod and are screwed in the top plate of
the inner firebox and silver soldered in the outer firebox. This type of
stay is relatively easy to fit and solder in the boiler and is easy to check
if all the individual stays did have a good fillet if silver solder all
around. The water circulation on top of the firebox should be good with this
kind of stays
Comparison in size
The new locomotive 'Didcot' on 5"
gauge (scale 1: 11.3) standing next to my 0-6-2 'Mona' on 3.5 " gauge (scale
1 : 16). Although the 14xx class loco was a diminutive locomotive, it's
still a big engine to handle in 5" gauge and weighs already more now, than
the 25 kilograms of the 'Mona'. The outer diameter of the boiler barrel of
the 'Didcot' and 'Mona' are the same: 106 mm. Note also how good the view is
inside the firebox, due to the conical shaped fire hole ring.
GWR 2-4-0 and
GWR 0-4-2
At an annual live steam meeting in
Turnhout (Belgium)
in May 1999 some model engineers of the 'Bromsgrove Society' from UK came
over with a lot of British prototype locomotives. Ray Dodds GWR 'Metro'
2-4-0 is standing here next to my GWR 0-4-2 'Didcot'. Both locomotives are
very much a like in over all size, wheel dimension, boiler and motion and
steam engines. It gave me some indication in how my locomotive will perform
on the track, once completed.
The only
14xx model I ever
saw of an 14xx class locomotive is this Arfix 00-gauge 1420 locomotive. The
small model is useful to see in three dimensions how my locomotive will
become.
The 14xx class locomotive
was also
available in kit form from Winson Engineering,
but this firm went bankrupt.
Click here
for details of the Winson locomotive owners.
On that site you could
see all the parts that go in to making the model,
nicely laid out side by side. A new firm "Modelwork
International ltd." is bringing
the kit back on the market in March 2004
The
foundation ring
consists of four separate pieces of copper bar, that are riveted and
soldered in position.
The photo shows the first part just
after it was soldered, with
the flux still on it. Where there isn't any flux, the copper will turn black
after cooling down. Pickling the boiler in acid will remove this black
oxidation layer.
A lot of
heat is needed to solder the other pieces of the foundation ring. I did
this alone holding the two Sievert burners and trying to hold the silver
solder. This isn't the most comfortable way to proceed and some assistance
would have been be more practical.
At our annual steam-up at Breda in
1999, the 'Didcot' stood on the small stand of
the Ground Level 5" Gauge
Mainline Association which Chris Boeckstyns and I set up for that
occasion. This UK based model engineering society of which we both are
members, is involved in running models of mainline prototypes (locomotives
and rolling stock) to a schedule. Like playing with a 00-gauge train-set,
only bigger and with real steam! Once the 'Didcot' is finished I want to
build some goods wagons to go with it. From Doug Hewson I already ordered
some nice scale drawings of a GWR brake van and a closed van. See
http://www.the-hewsons.demon.co.uk/ for some nice pictures of 5" gauge
rolling stock.
The stays are of the screwed and
caulked type. At a
spacing of 16 mm,
M4 holes were drilled and tapped, to take up
the 4mm copper threaded stays.
Drilling the holes
in the throat plate called for an extended drill. Therefore the 3.4 mm drill
was glued with Loctite in a 8 mm long steel rod. Drilling this way went
fine, although the long drill needed some guidance by hand.
Tapping in copper
plate isn't that difficult, as long the correct tap for the job is used. I
can be a bit awkward when tapping close to the boiler barrel, but by
removing one handle from the wrench it went fine.
The final silver soldering operation
was the soldering of the
backhead. For this soldering operation, the help of a colleague model
engineer was needed, and Dick Summerfield (http://www.iae.nl/users/summer/16mmngm/
) was willing to help. He kept the general boiler temperature high with the
propane torch, when the soldering was now done with an Oxy-fuel torch. The
greater heat applied made silver soldering a lot easier.
Whit this equipment the job was done
within a few minutes and even
soldering the thick
fire door hole ring went relatively easy. Two 250 mm long and 1.5 mm
diameter filler rods were used to solder the back head alone.
The boiler weighs now 9 kilograms
and has a volume of 2.5 litres.
After the summer holidays (in which
I went to the
GW Society
at Didcot England, for making photo's of the real locomotive which is still
running there) we went for a steam-up to Breda
with my 3.5 " locomotive.
I brought the
'Didcot' along, to see how it would negotiate the curves in the track,
with the full boiler weight now resting in the wheels.
The model was pushed along by hand
and all went fine. The 5" locomotive is
rolling very
smoothly on the track and is very stabile in the curves. Later we even
coupled the 'Didcot' behind the 'Mona' and towed her along for several laps.
The trailing wheels are now equipped
with working leaf springs. To
keep them flexible, not all the leafs were made from steel spring strip (10
x 1 mm), but some of them were made from soft aluminium. If you look closely
to the picture you can see the light grey ones, that are made of aluminium.
After all the tapping for the boiler
stays was completed, the boiler was put in the
dishwasher (together with an
other boiler of an 3.5 " gauge GNR Large Atlantic locomotive 'Maisie', which
a started a long time ago, but still didn't completed yet) .
After washing, the spotless clean
boiler could now undergo the last stage of construction; the screwing in of
all the boiler stays and placing of nuts on each end of the stay. This took
up several evenings and resulted in some sore finger tips. Afterwards they
were all caulked with a 'high melting point' soft solder rather than silver
solder. The boiler of the 'Mona' is of the same construction (designed by
'LBSC') and this worked fine.
At our last steam-ups in Breda one
of our club members found out that this method is not only easy during
manufacturing, but is also a very good safety measure if the water level
should drop to low. He had trouble and the water level fell dangerously low.
The soft solder of the top row of the stays melted and water and steam
extinguished the fire before any real harm was done. He dismantled the
locomotive at home, cleaned the boiler, resoldered the stays and was back in
business in no time!
The finished boiler was now ready
for hydraulic
testing. I had to make a small water pump for that, which was connected
via a copper pipe to one of the blow down valves bushes. All the others were
blanked off, except for the top feed bush, to which a pressure gauge (which
I got for the Dutch Railway Workshops at Tilburg) was attached.
The boiler was completely filled
with water and pumping began. Within a few strokes of the pump the pressure
began to rise. Only to find that some stay were still leaking a few
droplets. So the water was let of, all the plugs were removed and the few
stays were re soldered.
The second time all went well and the testing
pressure of 10 Bar (1Mpa or
145 PSI) was reached. This pressure was kept for about 30 minutes.
When all was well, I contacted the
Boiler Inspector
and made an appointment for the official test. On the first of November
1999 the boiler was approved by the Inspector for the hydraulic test. A
boiler certificate will be issued however after the steam test.
The
unique number of the boiler
stamped on the foundation ring. 9909 stands for the year 1999 and 09 means
that is the ninth boiler that was tested and approved that year.
This wraps it up for now. I've
now started with the tanks, cab and bunker and you'll
see that in part 3.
There are two ways of doing things:
The wrong way or the Great Western Way